Remodeling Overview
Needs of remodeling
Effect of remodeling
When an elevator is used for a long time, its parts become aged and break frequently because of mechanical fatigue, changed characteristics of electric components, and abrasion.
They cannot be fundamentally solved with a simple part replacement for maintenance, which will even increase economic burden.
Furthermore, the performance and efficiency will not match those of new models.
Remodeling is the best way to improve performance and safety while extending service life by replacing functional and exterior parts as required.
Improved stability
· Reduced failures and safe operation with VVVF control
Cost savings
· Lower cost than a full replacement
· Reduced repair costs by replacing old parts
· Energy savings with VVF control
Control type | Power consumption /month | Remarks |
Existing type | About 100 kw/h | Capacity: 8 Passengers |
Inverter control | About 60kw/h | Capacity: 8 Passengers |
Improved performance
· Improved ride – Smooth acceleration and deceleration speed control
· Reduced repair costs by replacing old parts
Improved interior
· Improved image and value of buildings with better fittings and modern design
Stage-specific remodeling details and period
Daesung IDS guarantees high technology, low cost, and short work time with multiyear remodeling knowledge.
Method | Details | Features | Power consumption/month - Standard method | Power consumption/month - Short-term method | Additional works |
System replacement | Replacement of an electric part of a control panel | 7days | 4days | 4days | Not applicable |
Partial replacement | Replacement while reusing some parts | 23days | 4days | 4days | Additional work required |
Full replacement | Full removal and replacement | 32days | 4days | 4days | Much additional work required |
Details of system replacement
· Control Panels, OPB, external sign, car top junction box, drive cable, car door control system, cables in elevator shaft, and switches
Details of partial replacement
· Control Panels, OPB, external sign, car top junction box, drive cable, car door control system, cables in elevator shaft, switches, car exterior design, lightings, traction machine, and car doors
Details of full replacement
· All items except for rail, balance weight, and buffer
They may be subject to changes based on field conditions.
1. Standard method: Work will proceed based on the standard method.
2. Short-term method: An additional cost will occur for overtime (optional).
Method | Details | Features | Power consumption/month - Standard method | Power consumption/month - Short-term method | Additional works |
System replacement | Replacement of an electric part of a control panel | 7days | 4days | 4days | Not applicable |
Partial replacement | Replacement while reusing some parts | 23days | 4days | 4days | Additional work required |
Full replacement | Full removal and replacement | 32days | 4days | 4days | Much additional work required |